NLC

 

 

bullet.gif (900 bytes) Details of Existing Generating Stations and their performance

bullet.gif (900 bytes) Details of Generating Stations under construction

 

 

 

 

 

 

 

Table : Details of Existing Generating Stations and their performance.

S.No.

Name of Station

Location

Installed Capacity
(No of UnitsXMW)

Date of commissioning

Fuel

Fuel Linkage

Performance during the year 1998-99

Region

State / District

Energy generated (Mus)

Energy sent out (Mus)

PLF%

Availablity %

               

1

Thermal Power Station-I

Southern

Tamil Nadu / Neyveli Cuddalore

Unit - I 50 MW

23.05.62

Lignite

             

Unit - II 50 MW

29.01.63

Unit - III 50 MW

11.06.63

Unit - IV 50 MW

27.06.63

Unit - V 50 MV

29.04.64

Unit - VI 50 MW

24.08.65

Unit - VII 100 MW

28.03.67

Unit - VIII 100 MW

12.12.69

Unit - IX 100 MW

21.02.70

       

STATION - 600 MW

     

3772.23

2845.33

71.77%

76.75%

2

Thermal Power - II

Southern

Tamil Nadu / Neyveli Cuddalore (TN)

Unit - I 210 MW

17.01.88

Lignite

              

Unit - II 210 MW

06.02.87

Unit - III 210 MW

29.03.86

Unit - IV 210 MW

30.03.91

Unit - V 210 MV

30.12.91

Unit - VI 210 MW

30.10.92

Unit - VII 210 MW

19.06.93

       

STATION - 1470 MW

       

9568.14

8199.8

74.30%

84.44%

 

Table : Details of Generating Stations under construction

S.No.

Name of Station

Location

Installed Capacity
(No. Of unitsXMW)

Fuel

Target date
of commisioning

Region

State / District

1

TPS - Extension

Southern

Tamil Nadu
Cuddalore

Unit - 1 210 MW

Lignite

Nov '01

Unit - 2 210 MW

May '02

Note : The data as furnished by NLC has been reproduced. The Commission has not verified it.

1. Energy Generated (Mus) - Energy generated at the generatory terminals (gross energy).
2. Energy Sent Out (MUs) - Energy injected into the grid (energy generated - Aux. Consumption)
3. Plant Load Factor (PLF) %- The ratio of actual energy generated during the period and the max. energy generated. This could have been at rated installed capacity during the period.
4. Availability % - The ratio of capability of generating station in MW during the period and the installed capacity of the generating station.

 

 


 